This 6 MW, two-part project is 100% fully owned and controlled by the Pic River First Nation. The project's design leverages Pic River's significant experience in the hydro industry and the associated aspects of Power Purchase Agreements (PPAs), Ministry of Natural Resources (MNR)/Ministry of the Environment (MOE)/Federal environmental assessment (EA) requirements, third-party issue mitigation, community consultation, and joint venture negotiations. Pic River is undertaking extensive endangered species measures to ensure that impacted species – such as the Lake Sturgeon – and is ensuring the highest degree of environmental accountability throughout the project's lifespan. Both sites have readily accessible transmission capacity and will add significantly to Pic River's mix of renewable energy technologies.